Getting ready for deck painting

Getting ready for deck painting

During the last month of boat works I focused on preparing the deck for painting, a job that shouldn’t require a month of full time work. In reality, this task is much more than sand the old paint off and clean the surface.

The job can be summarized by this sequence:

  • sanding
  • fiberglass jobs where needed
  • more sanding
  • more fiberglass repairs
  • fairing
  • more sanding
  • more fairing

Do, repeat and loop the sequence to one’s own standard of “ready to go”.

A “detail oriented personality” could go ahead in an obsessive and repetitive challenge until the fingertips will be scratched to the bone  before considering the deck ready for painting. Luckily I am not that kind of person. On the other hand I am a victim of creative ideas randomly rising  during the progression of the project. This modifications sometimes put a heavy hand in the plan, disrupting it totally.

Deck modifications

Before a thorough deck preparation could start I had to complete few design ideas that would help solve some issues we experienced with the original deck layout.

Columbia 29s were built with an interesting deck to hull joint that rises few inches above the deck to form  bulwarks from aft to end. This was also the designer’s signature to give a very nice sheer line to the deck. We love the bulwark on Tranquility, they help keeping your feet on deck when the boat heels as well as providing a barrier for objects that wants to fall overboard.

The drawback is that mooring lines and other overhanging hardware have to climb this protective wall incurring in the risk of chafing or making their installation difficult. This is particularly true on the bow, where the anchor roller and other deck hardware had to rest on a precarious base made of untreated construction grade lumber that obviously had rotted away and became a condo for photophobic insects by the time we owned the boat. Shame on whoever cobbled up that ridicolous solution!

The problem had to be addressed with some creativity and a lot of courage. When it was clear that Tranquility required a “nose job” I went through the anxieties and insecurities common to pre and post plastic surgery. With a heavy hand and a heavy heart I pressed on the angle grinder cutting away inches of fiberglass, trying to draw a symmetric line.  I then composed a base layer using several odd shaped teak hardwood pieces, put together with thickened epoxy and fiberglass.

This slideshow requires JavaScript.

Olin Stephens may be turning in his grave for the new line of his design but the occasional Yacht Club guests walking by were actually pleased with Tranquility’s new look. Our friend Brian even ventured in calling the new look “race boat like”.

Similarly I did a little modification on the transom corners to create a better surface for hardware and mooring lines.

This slideshow requires JavaScript.

Stanchion bases

Raised stanchion bases were another upgrade we thought would improve Tranquility’s deck. A thicker and wider base would help preventing stress cracking from wobbling stanchions and keep their base raised from water puddles.

After laminating few layers of biaxial fiberglass tape I cut the stanchion base a little wider and then glassed it permanently to the deck.

This slideshow requires JavaScript.

New toe rail

The original toe rail was made of three pieces of teak forming an overturned U on top of the bulwark and it was  fastened with bronze screws. Age and damages had reduced the coverage and efficacy of the teak toe rail. A recent experience during a delivery raised curiosity towards the hull to deck joint on our boat and so I had to get the wood off and expose the joint. The removal job was one way and I knew that after that I needed to give Tranquility brand new toe rail. I fancied a project featuring  fancy solid teak bar bent in shape over the bulwark but after realizing that I purchased a not so great stock of teak hardwood from E-bay I had to reconsider the idea. You get what you pay for they say, so I opted for using that wood to create permanent epoxy and fiberglass toe rail that will be painted with the deck.

The project include around 100 stainless steel #8 sheet metal screws (one every 8 inches) to join the inboard and outboard teak strips as well as a huge amount of epoxy and colloidal silica and fairing compound as additives. A 6 inches fiberglass cloth was wrapped around the edge and the overhanging extremity sanded off after the resin cured.

This slideshow requires JavaScript.

Sanding

Every project had its own portion of sanding so soon Tranquility’s deck became a patchwork. But for our particular paintjob we had to remove any trace of the one part enamel paint we used in our first refit in New Bedford MA. After giving one part paint a try we decided to go with two part that is supposedly harder and more resistant to UV action and wear. To do so we have to remove any trace of one part paint first, as it would not stand the aggressive solvent of two part epoxy primer and polyurethane topcoat and flake off ruining the paintjob.

That required a lot of scraping that we diligently executed using wood chisels. With Kate’s help we went around and scrape it all off, revealing a calico pattern formed by several layers of paint, from the original gelcoat to more recent epoxy primers.

work_deck_sanding
The multicolor deck during sanding operations

While operating the chisel closely to the deck I also exhumed several fiberglass delaminations deeply buried under fairing compound and primer. A delamination happen when two layers of fiberglass start to peel apart from each other leaving a “soft spot”. Everytime the first reaction was to turn my head away and say we would live with it. But I always succumbed to the temptation of fixing them and make the deck stronger. After all how bad could it be another fiberglass job?

This slideshow requires JavaScript.

Going through al these pictures I see what I spent the last month doing, and I feel a little less bad about my progress. The deck is not painted yet though and right now we are dealing with our own level of perfectionism and waiting for good weather. Meanwhile: do, repeat and loop.

 

Getting ready for deck painting

Getting ready for deck painting

During the last month of boat works I focused on preparing the deck for painting, a job that shouldn’t require a month of full time work. In reality, this task is much more than sand the old paint off and clean the surface.

The job can be summarized by this sequence:

  • sanding
  • fiberglass jobs where needed
  • more sanding
  • more fiberglass repairs
  • fairing
  • more sanding
  • more fairing

Do, repeat and loop the sequence to one’s own standard of “ready to go”.

A “detail oriented personality” could go ahead in an obsessive and repetitive challenge until the fingertips will be scratched to the bone  before considering the deck ready for painting. Luckily I am not that kind of person. On the other hand I am a victim of creative ideas randomly rising  during the progression of the project. This modifications sometimes put a heavy hand in the plan, disrupting it totally.

Deck modifications

Before a thorough deck preparation could start I had to complete few design ideas that would help solve some issues we experienced with the original deck layout.

Columbia 29s were built with an interesting deck to hull joint that rises few inches above the deck to form  bulwarks from aft to end. This was also the designer’s signature to give a very nice sheer line to the deck. We love the bulwark on Tranquility, they help keeping your feet on deck when the boat heels as well as providing a barrier for objects that wants to fall overboard.

The drawback is that mooring lines and other overhanging hardware have to climb this protective wall incurring in the risk of chafing or making their installation difficult. This is particularly true on the bow, where the anchor roller and other deck hardware had to rest on a precarious base made of untreated construction grade lumber that obviously had rotted away and became a condo for photophobic insects by the time we owned the boat. Shame on whoever cobbled up that ridicolous solution!

The problem had to be addressed with some creativity and a lot of courage. When it was clear that Tranquility required a “nose job” I went through the anxieties and insecurities common to pre and post plastic surgery. With a heavy hand and a heavy heart I pressed on the angle grinder cutting away inches of fiberglass, trying to draw a symmetric line.  I then composed a base layer using several odd shaped teak hardwood pieces, put together with thickened epoxy and fiberglass.

This slideshow requires JavaScript.

Olin Stephens may be turning in his grave for the new line of his design but the occasional Yacht Club guests walking by were actually pleased with Tranquility’s new look. Our friend Brian even ventured in calling the new look “race boat like”.

Similarly I did a little modification on the transom corners to create a better surface for hardware and mooring lines.

This slideshow requires JavaScript.

Stanchion bases

Raised stanchion bases were another upgrade we thought would improve Tranquility’s deck. A thicker and wider base would help preventing stress cracking from wobbling stanchions and keep their base raised from water puddles.

After laminating few layers of biaxial fiberglass tape I cut the stanchion base a little wider and then glassed it permanently to the deck.

This slideshow requires JavaScript.

New toe rail

The original toe rail was made of three pieces of teak forming an overturned U on top of the bulwark and it was  fastened with bronze screws. Age and damages had reduced the coverage and efficacy of the teak toe rail. A recent experience during a delivery raised curiosity towards the hull to deck joint on our boat and so I had to get the wood off and expose the joint. The removal job was one way and I knew that after that I needed to give Tranquility brand new toe rail. I fancied a project featuring  fancy solid teak bar bent in shape over the bulwark but after realizing that I purchased a not so great stock of teak hardwood from E-bay I had to reconsider the idea. You get what you pay for they say, so I opted for using that wood to create permanent epoxy and fiberglass toe rail that will be painted with the deck.

The project include around 100 stainless steel #8 sheet metal screws (one every 8 inches) to join the inboard and outboard teak strips as well as a huge amount of epoxy and colloidal silica and fairing compound as additives. A 6 inches fiberglass cloth was wrapped around the edge and the overhanging extremity sanded off after the resin cured.

This slideshow requires JavaScript.

Sanding

Every project had its own portion of sanding so soon Tranquility’s deck became a patchwork. But for our particular paintjob we had to remove any trace of the one part enamel paint we used in our first refit in New Bedford MA. After giving one part paint a try we decided to go with two part that is supposedly harder and more resistant to UV action and wear. To do so we have to remove any trace of one part paint first, as it would not stand the aggressive solvent of two part epoxy primer and polyurethane topcoat and flake off ruining the paintjob.

That required a lot of scraping that we diligently executed using wood chisels. With Kate’s help we went around and scrape it all off, revealing a calico pattern formed by several layers of paint, from the original gelcoat to more recent epoxy primers.

work_deck_sanding
The multicolor deck during sanding operations

While operating the chisel closely to the deck I also exhumed several fiberglass delaminations deeply buried under fairing compound and primer. A delamination happen when two layers of fiberglass start to peel apart from each other leaving a “soft spot”. Everytime the first reaction was to turn my head away and say we would live with it. But I always succumbed to the temptation of fixing them and make the deck stronger. After all how bad could it be another fiberglass job?

This slideshow requires JavaScript.

Going through al these pictures I see what I spent the last month doing, and I feel a little less bad about my progress. The deck is not painted yet though and right now we are dealing with our own level of perfectionism and waiting for good weather. Meanwhile: do, repeat and loop.

 

Cockpit locker drainage channels and existential concerns

Cockpit locker drainage channels and existential concerns

Lately the tone of my blog posts have assumed an unprecedent technical twist. I have always found hard to describe the refit of Tranquility in great detail, and most of the countless jobs proceeded unaccounted. What’s exciting about writing posts like “laminating fiberglass backing plate for deck hardware (and achieving physical flexibility during installation)“, “sealing umpteenth hole in the deck with thickened epoxy” or “screws and bolts inventory: am I missing any“?

Moreover I am a former psychologist and my education and training concernes things like “emotional defense mechanisms“, “coping strategies” and “cognitive fallacies“, and I used to handle tools like “active listening” “participant observation” and “network analysis“. The language of the master shipwright is still an uncharted territory and the rules of technical writing a mystery.

I also assume that the reader (you) is not very concerned about a bunch of technical digressions on boat construction and repair. It may be a wrong assumption in the end, as the whole point of taking an old boat and sail it through the horizon on a budget requires being able to perform a thorough analysis of the weak points of “the old lady”, and perform satisfactory upgrades with little or none adult supervision. Funny enough “How-to-Do-It-Yourself” articles are the ones I seek with a certain continuity online, to find inspirations about designs and building techniques, so I may fall out of the group of representative readers of this blog according to my idealistic audience.

These are some of the reasons why I find very difficult to write about boat projects and improvements  but despite of that not much else is happening in my life and so I would either shut up (possible) or keep telling the story of the countless jobs that are going on inside and on Tranquility.

Selecting few specific jobs and turning them into a narration is becoming an usual activiy, so hopefull it will be less and less hard.  It turns out it’s also a good way to keep track of how long these project are taking, which is very long. As soon as one is finished it has a slingshot effect to the next one and helps bringing enthusiasm to my work and to the overall goal, so I would be happy to see more and more of these posts appearing on the blog.

Lately the speed of work increased and people at the dock are noticing Tranquility changing face and stops for few words about what’s next and where are we going to take the boat (well where she is going to take us…). Kate also had some time to dedicate to Tranquility and this was another huge help to the overall project. She has a great ability for planning and in just one hour spent in the garden with a calendar in her hand we enlighted the next three weeks projects and tasks down to plankton size. With this new clarity it seems we have a possible deck painting date on mid November, and few days when we will be actually both working on Tranquility.

Drainage channels for watertight cockpit locker

During our Atlantic Ocean offshore passage and in other legs of Tranquility’s voyage from New Bedford to Brunswick rain and occasional crashing waves found their way into the cockpit locker and sloshed into the bilge. After coming to a rest on the Georgia Coast and contemplating the idea of more offshore sailing in the near future we wanted to make sure that we are not taking in water from this or other openings on the boat.

Tranquility has a cockpit locker on port side accessible through the cockpit seat via a very heavy door. The starboard side has no opening as a sleeping quarter bunk lies underneath it. None of these setups were original from the builder: the whole port quarter side was modified by one of the previous owners to fit the locker, which is divided from the interior by a bulkhead that would host the chart table on the cabin side. On starboard side, somebody did the opposite, fitting a bunk where it used to be a cockpit locker. These and other amenities are some of the surprises you could find when you buy a fifty years old sailboat.

Unfortunately for us the cockpit locker/chart table modification was very poorly done and gave us a lot of headache when it was time to improve and eventually redesign the area. The separating bulkhead wasn’t even tabbed (permanently fiberglassed) to the hull and allowed the locker to drain straight into the bilge soaking everything was lying in its path. The chart table would make claustrophobic a 5 years old kid with the resuslt of being perfectly unuseful on board. Finally the cockpit locker door was resting on a very sketchy support that was conceived with the idea of draining extra water sipping through the door sides, but that in fact was a simply terrible half-finished solution that failed completely in its purpose.

Earlier on the projects timeline I adressed the bulkhead problem tabbing it to the hull and making the entire locker a watertight section of our ship. Not communicating anymore with other parts of the boat, the locker will contribute to the buoyancy of the vessel in case water finds its way into the boat. Last spring I also rebuilt the chart table / nav station with the idea of increasing storage and housing the battery bank for our electric motor.

The Lousy cockpit locker drainage system
The lousy cockpit locker drainage system and a pathetic attempt to fix it
A detail of the draining channel as found on Tranquility.
A detail of the draining channel as found on Tranquility.

The drainage channel we found on Tranquility  was one of our least favorite part of the boat but it was also something we couldn’t handle during our first refit in New England, so we just tried timidly to improve it along the way when the real only possible way to fix it was to tear it apart and redo it from scratch. Finally after spending a lot of time designing ideas and procrastinating any concrete action in favor of other projects, I finally started to stare at the problem directly. At the beginning I was in favor of epoxy coated plywood construction, but then my friend Fernando talked me more and more into trying with fiberglass construction. Ultimately fiberglass is for life! After a lot of time spent in woodworking projects for the companionway I figured it was healthy to switch paradigm and tackle a messy fiberglass project. I think I am a messy enough person for such a task.

Mold construction for Fiberglass channels
Mold construction for Fiberglass channels

After looking at examples of drainage channel systems on other boats I finally came out with a design and I decided for angled lateral channel that will allow drainage even when the boat is heeled. Building the  molds for the fiberglass construction wasn’t hard at all as I had some rounded corner molding in my woodpile that happened to be just perfect for the job. Two pieces side by side would form a round shaped channel about one inch and a half wide. I successfully mounted them on two pieces of 3/4 of a inch thick PVC or Plywood screwed together and taped with adhesive packaging tape (cheap and easy to use). Epoxy won’t stick to plastic so if you cover anything with packaging tape or any other plastic wrap it will released the impregnated fiberglass once cured.

Fiberglas molds ready for laminate
Fiberglass molds ready for laminate
Fiberglass channel
Out of the mold fiberglass channel

I then laminated fiberglass cloth and mat onto the molds forming a slightly bigger shape than the desired part. Once the epoxy cured I popped them out of the mold and shaped them to the final measurements using an angle grinder with a cutting disk, before final sanding and cleaning. Some of the channels reminded me of delicious tacos but I restrained myself from eating them.

Fiberglass components of the drainage channel
Components of the drainage channel sanded and cleaned

Together with the three channels I laminated some 90 degrees shaped pieces that helped to fit the parts to the deck for final assembly. Screws held the structure in place while thickened epoxy cured overnight. The following day I removed the screws and engaged a grinding match in the confined space of the locker, making sure to wear all the possible protective clothing and gear for this miserable job. After clean up of both my persona and the locker I proceeded challenging the law of gravity with the messy job of fiberglassing the structure to the deck alternating several layers of fiberglass mat (for waterproofing) and cloth (for structure), and trying my best to avoid the epoxy resin dripping from the overhead.

Screws hold the channels in place while epoxy cures
Screws hold the channels in place while epoxy cures
All the parts are dry-fit before being fiberglassed in place
All the parts are dry-fit before being fiberglassed

With this last upside down job accomplished it was time to fit a lip that will give enough surface for a gasket to make a watertight seal. I had some long and thin pieces of teak lying around on Tranquility (what’s not on Tranquility?) and so I decided to epoxy and fiberglass them around the internal perimeter of the locker. To have a perfect seal with the overlying door I used again thickened epoxy placed on top of the lip. This time I let the law of gravity work for me placing the original lid on top and protecting it with with packaging tape (my new best friend). In this way the still soft thicked epoxy adheres to the door contour forming an even surface of contact after the extra material squeezes out.

The lip for the channel is made with teak strips glassed in place
The lip for the channel is made with teak strips glassed in
Lip is epoxy fitted and then laminated with fiberglass
Lip is epoxy fitted and then laminated with fiberglass

Two half inch sized holes at the lower end of the inboard channels drain the water into the cockpit and then in the ocean through the cockpit scuppers. Next, in this multi-stage multi-level project a whole operation of fairing and sanding will culminate with the paintjob soon to happen on the entire deck. For now I am glad enough I can leave the boat under the rain without having to empty a swamped locker and in perspective I feel confident that less water will find its way in the boat during blue water sailing and foul weather.